Please consider overhauling for cost reduction! We support dry/rotary pumps from various manufacturers such as Ebara and Edwards!
Disassembly and cleaning of the pump body, as well as repairs of malfunctioning parts, parts replacement, and assembly testing, will be carried out meticulously by technicians with many years of expertise.
Standard replacement parts include bearings, O-rings, and oil, all of which will be replaced with parts that comply with the manufacturer's standard replacement parts. If special replacement parts or additional work are required, we will contact the customer and resume work only after obtaining their consent, so please rest assured.
■ Delivery Time
The standard delivery time is based on one month (from the time we receive it to shipping). If it takes time to receive special replacement parts, we will keep you informed. If you are in a hurry, we can also accommodate requests within 1 to 2 weeks, so please feel free to consult us.
■ Main Testing and Inspection Items
1. Common Items (Reported)
Achieved pressure, current value, leak check pass/fail
2. Common Items (Internal Management Record)
Exhaust blockage acceleration test
3. Special Items (Reported)
45-60Hz capacity (Ed DP), exhaust capacity (Ed MBP)
4. Others (Internal Storage Record)
Operation of each sensor, vibration, flow rate, continuous operation, etc.